
Capabilities
From brief to container.
A new product takes shape in roughly 90 to 100 days, led by more than twenty industrial design, structural and electrical engineers. Every stage happens here.
Industrial design
Form, materials and finish, developed against your brand rather than a catalogue template.
Structure
Mechanical design, tolerance and vibration control — the part a turntable lives or dies on.
Electronics
Amplification, Bluetooth, tuner and DSP, specified for the market and its certification regime.
Tooling
Tooling built and validated in-house, so a change in design is not a change in supplier.
Assembly
Dedicated lines, scaled up in peak season.
Quality control
Anechoic-chamber validation and 100% inspection before packing.
Monthly capacity
| Bluetooth speakers | 50,000 / month |
|---|---|
| Wooden music centres | 40,000 / month |
| Micro systems | 30,000 / month |
Minimum order
Typically 1,000 pieces per model. Packing figures for 20GP, 40FT and 40″HQ containers are listed on every product page.